Location | Middletown, CT |
Owner | National Healthcare Associates |
Industry | Healthcare |
General Contractor | Self-Perform |
Completion Date | November 2024 |
C&H Electric successfully delivered a critical emergency generator upgrade for the Water’s Edge Skilled Nursing facility. The project included modifying and upgrading the electrical service to improve emergency power readiness, ensuring uninterrupted operations for patient care.
The Challenges
- Replacing a non-functional unit while maintaining power continuity.
- Coordinating utility schedules to relocate the main switch and increase service size.
- Providing seamless temporary power solutions during the extended shutdown period.
The Solutions
- Modified 3,000 AMP Service: Upgraded and relocated the exterior switchboard to allow integration of an external main switch.
- Emergency Generator Installation: Connected a 320Kw generator and automatic transfer switch (ATS) to support critical emergency circuits.
- Temporary Power: Utilized a temporary generator to maintain operational stability throughout the extended shutdown phase.
- Rigging New Equipment: Safely removed the existing non-functional unit and installed the upgraded generator into place.
The Results
- Improved Reliability: Upgraded infrastructure ensures uninterrupted emergency power for the skilled nursing facility.
- Seamless Coordination: Successfully executed utility relocation without impacting facility operations.
- Enhanced Capacity: Increased service size accommodates future facility demands while meeting healthcare safety standards.
C&H Electric’s expertise in complex electrical upgrades reinforced Water’s Edge Skilled Nursing facility’s commitment to delivering safe and reliable care for their residents.