Location | Stamford, CT |
Owner | Yale New Haven Health, Greenwich Hospital |
Industry | Healthcare |
General Contractor | The Whiting-Turner Contracting Company |
Completion Date | October 2024 |
C&H Electric partnered with The Whiting-Turner Contracting Company to deliver the Greenwich Hospital Behavioral Health MOB project, a 10,000 sq ft off-campus medical office suite dedicated to outpatient Psychiatry and Behavioral Health services for Yale New Haven Health.
The Challenges
- Precision scheduling to match a rapid construction timeline.
- Efficient installation methods to minimize material handling and reduce on-site waste.
- High safety standards with anti-ligature and tamper-proof materials for the behavioral health facility.
The Solutions
- Prefabrication of Electrical Devices: Electrical components were prefabricated at our production facility, ensuring faster installation and minimal disruption on-site.
- Fire Alarm Systems: Installed a new, local fire alarm system to enhance safety across the facility.
- Low-Voltage Pathways: Ran pathways for low-voltage data, telecom systems, and audio/visual wiring, ensuring seamless technological integration.
- Safety-Driven Design: Utilized tamper-proof and anti-ligature materials throughout the space to align with stringent safety requirements for behavioral health environments.
The Results
- Accelerated Project Timeline: Prefabrication enabled an efficient, waste-reducing workflow.
- Enhanced Facility Safety: Anti-ligature and tamper-resistant systems promote patient safety and operational security.
- Modern Infrastructure: Seamless integration of fire alarms and low-voltage systems enhances facility functionality.
C&H Electric’s commitment to quality, safety, and innovation ensured that the Greenwich Hospital Behavioral Health MOB was equipped to meet the needs of patients and staff, reflecting excellence in healthcare infrastructure.












